Laserfiche WebLink
~_ <br />u <br /> <br />6usCH, HUTCHISON & ASSOCIATES, INC. CONSULTING ENGINEERS <br />1107 FLEETWOOD DRIVE BAYTOWN, TEXAS 77520 PHONE 1713) 422-8213 <br />~1 '1 <br />u <br />March 17, 1981 <br />Honorable Mayor and City Counsril <br />City of La Porte <br />P. 0. Box 1115 <br />La Porte, TX 77571 <br />3333 EASTSIDE, SUITE 265 HOUSTON, TEXAS 77098 (713) 523-2367 <br />CONTRACT AWARD RECOMMENDATION - PAINTING AND REPAIRING ELEVATED.WATER <br />STORAGE TANKS <br />On Wednesday March 11, 1981 five bids were opened and read on the referenced <br />project. The low bidder for the work was that of Mid-South Tank Utilities <br />Inc., at $71,400.00. This number includes painting the name "La Porte" at <br />a second location on each tank and installation of an internal ladder in the <br />• Fairmont Park tank. These two items can be deducted at a value of $1000.00 <br />and $2500.00 respectively. The amounts would then be as shown on the attach- <br />ed bid tabulation sheet. <br />We feel that Mid-South is a well established contractor capable of performing <br />the spec if ied work. We therefore recommend that they be.awarded the contract <br />for one of the alternates as determined by the Council. <br />ameG~~~Hutchison, P.E. <br />PH/pf <br /> <br />• <br />