Laserfiche WebLink
~.. <br />• <br />,~ <br />MEMORANDUM <br />May 19, 1981 <br />T0: J. R. Hudgens, J. Hodge, J. <br />FROM: John Joerns <br />Sease,r P. Hickenbottom <br />SUBJECT: La Porte Water Bond Project: Recommended Priorities <br />for Expenditure of $51,000+ Remaining Funds <br />• <br />• <br />Attached is a list of recommended water system improvement <br />projects compiled from various sourcesl. After review of the <br />list and considering the funds available, the Engineering Depart- <br />ment has arrived at a proposed priority Fist for the completion <br />of the La Porte Water Bond Project. The projects designated <br />here are designed to improve the water distribution of a general <br />area and/or eliminate dead-end .mains, and are not necessarily <br />for the service of one specific area. <br />Proposed Priority Benefits <br />8-inch water main from South C <br />and Idaho to Idaho and Park - <br />approximately 2000 feet <br />Leg one of completing 8-inch <br />loop in East .La Porte and <br />provide more fire protection <br />for the proposed Happy Harbor <br />expansion <br />6-inch main on South Holmes be- <br />tween Park Drive and Roscoe - <br />approximately 800 feet <br />6-inch main on South Brownell <br />between Park Drive and Roscoe2 - <br />approximately S00 feet <br />6-inch (or 8-inch) main on park- <br />way between Park and Roscoe - <br />approximately 800 feet <br />6-inch water main on Bayshore <br />Drive from Bellaire to Oak Grove <br />Avenue - approximately 850 feet <br />Replace existing 1~-inch line <br />and increase fire protection <br />Replace existing 1-inch line <br />and increase fire protection <br />Replace existing 2-inch line <br />in alley between Seabree2e and <br />Oak Grove Avenue <br />Complete 6-inch loop <br />1Sources: (1) Letter from Busch, Hutchison to La Porte <br />Public Works - <br />(2) Utility verification by La Porte Public Works <br />(3) Staff meetings with Fire Dept. and Public Works <br />2Location needs to be field verified by Public Works Dept. , <br />3Dependent on results of flow tests. <br />_._/~ <br />