My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1982-08-18 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1980's
>
1982
>
1982-08-18 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:56 PM
Creation date
3/21/2025 1:37:45 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
8/18/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />t CITY OF LA PORTE <br />INTER-OFFICE MEMORANDUM <br />TO: Jac~sipwenf C/ijty Manager <br />FROM: J~r~y Iipsc~q/, Dixector of Public Works <br />SUBJECT: S#~ee~' ~r~iorities - Unimproved <br />• <br />DATE: August 12, 1982 <br />In order ~o select unimproved streets for construction, the City Council <br />of the City of La Porte individually listed their priorities, and this <br />list was tabulated. Attached is the tabulated list in order of priority. <br />H. Carlos Smith previously prepared plans and specifications for five (5) <br />of the top eleven (11) streets prioritized by Council. These streets are <br />Bois D'Arc - #1, San Jacinto - #2, Lomax Drive - #3, Shirley Lane- #6, and <br />E. Fieldcrest - #11. Eighty five percent (85%) of the engineering fee has <br />been paid. . <br />The Public Works Department feels that these streets should be contracted, <br />• and that two (2) additional streets, W. Sunset Ridge - #~+, and North "L" - #5, <br />have plans and specifications prepared so that they can be contracted also. <br />Casts for engineering and construction can be broken down as follows: <br />Balance of previous engineering (15~) $ 3,338.00 <br />Cost to upgrade plans prepared 6,700.00 <br />Field survey to design two new streets 3,000.00 <br />Engineering fee for new streets ~ 7,75.00 <br />Construction staking for all streets ~ 8;000.00 <br />TOTAL ESTIMATED ENGINEERING COST $ 28,513.00 <br />Estimated construction costs for contracting these streets is as follows: <br />Total cost with 2 course surface treatment $~+57,~+00..00 <br />Total cost without 2 course surface treatment x+05,600.00 <br />Because the Public Works Department has all equipment needed to apply 2 course <br />surface treatment; I recommend that the City perform this function. With a <br />10,000 gallon heated storage tank, the City can pave each street as it is ready. <br />I recommend that the City construct the following streets: Browning - #7, <br />Ohio - D to E - #8, Nugent - E to >+00' South - #9, and N. 1st - Madison to <br />Barbour's Cut - #10. Additional streets can be paved if•time and money permit. <br />• <br />~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.