My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1982-08-18 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1980's
>
1982
>
1982-08-18 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:56 PM
Creation date
3/21/2025 1:37:45 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
8/18/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Hodge • • Page 2 <br />8~12J82 <br />Engineering cost estimate to upgrade the plans to reflect existing conditions <br />is as follows: <br />Lomax Drive $ 1,400.00 <br />E. Fieldcrest Drive $ 1,000.00 <br />Shirley Lane $ 200.00 <br />Bois D'Arc Drive $ 1,700.00 <br />San Jacinto Drive $ 1,600.00 <br />Santa Anna $ 800.00 <br />Total $ 6,700.00 <br />Balance of Fee $ 3,338.00 <br />(15% of 6.5% of Estimated Construction Cost of $342,200.00) <br />Fee on Sunset Midge & Fast North "L" St. <br />Field Surveys to Prepare Plans $ 3,000.00 <br />Fee @ 6.5% of Estimated Construction Cost $ 7,475.00 <br />Construction Staking for all streets $ 8,000.00 <br />Total Estimated Engineering Costs $28,513.00 <br />We would be agreeable to updating the plans and preparing the plans and <br />specifications for the additional streets and construction staking under the <br />terms of our previous contract with the City of La Porte. The fee under this <br />contract was 6.5% of the construction cost, with 85% of the fee having been <br />paid on those streets previously bid. The field work and construction staking <br />was on a basis of 250% of our payroll costs. The cost to upgrade the plans <br />was based on this method. <br />If you should require additional information or clarification of these <br />cost, please call us. <br />Very Truly Yours, <br />H. Car os Smith-Engineer & Surveyors, Inc. <br />H. Carlos Smith,P.E. <br />President <br />t <br />G~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.