Laserfiche WebLink
r ~.; <br />Bid Tabulation: <br />Fairmont Water Tower: <br />~tective Fencing <br />• • <br />Houston Standard Withers Creative <br />Fence Fence Fence Fence <br />Company Company Company Company <br />1. Construction of chain link fence $3 574.00 $3 678.00 $3 675.00 $3 154.00 <br />around Fairmont Water Tower. Fence <br />will consist of: 88' x 118', 9 ga. <br />_. ~, <br />fabric, 3 strands of 12~ ga. barbed <br />wire, 3" Sch. 40 corner posts, <br />2 3/8" Sch. 40 line post, 1 5/8" <br />Sch. 40 top rail, on 10' gate with <br />2" Sch. 40 frame, hung with Cox <br />Type Hinges, posts will be set in - _ <br />concrete. Corners braced and <br />trussed. Fence will be 7' overall.' <br />Bid total job complete. <br /> <br />2. Fence must be complete within 45 days 45 days 10 days 14 days <br />45 days after award by City Council. <br />Materials and workmanship must be <br />guaranteed for six (6) months <br />after completion for all defects. <br /> <br />*Denotes low bid. <br /> <br /> <br /> <br /> <br /> <br /> <br />