My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1982-12-01 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1980's
>
1982
>
1982-12-01 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:56 PM
Creation date
3/21/2025 1:37:58 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
12/1/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. • • • <br />•~ <br />• <br />Bu~7~1~1, HUTCHISON & ASSOCIA~'ES. ~NC• CONSULTING ENGINEERS <br />1107 FLEETWOOD DRIVE BAYTOWN, TEXAS 77520 PHONE (713) 422-8213 <br />3333 EASTSIDE, SUITE 283 HOUSTON, TEXAS 77098 (7131 523-2367 <br />J <br />November 15, 1982 <br />City of La Porte <br />P. 0. Box 1115 <br />La Porte, TX 77571 <br />ATTN: Mr. Jack Owen <br />City Manager. <br />STATUS OF THE MAIN LA PORTE SEWAGE TREATMENT PLANT <br />As of this writing the new plant ~s treating all of the city's waste water. <br />The Fairmont Park plant influent was diverted about 3 weeks ago and the old <br />main plant flow was added last week. The average daily flow is running about <br />1.8 million gallons per day. The quality of the plant effluent has been <br />meeting the permit standards until last week when the solids in the eff luent <br />has exceeded the permissible amount. This condition occurred because of <br />some problems with the sludge transf er system. The problem was cleared last <br />• Thursday and the plant should be running normally in a few days. <br />Regarding the completion of the plant, we have been working with the Contractor <br />on a lengthy punch list. While the Contractor has been willing, his actual <br />performance has fallen off considerably in the past month. We are meeting <br />with him this week to urge some concentrated effort and get the punch list <br />~.tems cleared. The only mayor item left for work is the belt press and its <br />peripheral equipment. It is to be .made ready next week at which time the plant <br />should have produced enough sludge to operate the system for a trial run. <br />Most other items are minor and do not affect the operation of the plant. <br />for your information the current punch list is attached. Two items included <br />lit the. electrical list are Change Order No. 5 pieces of equipment which have <br />not yet Been 3:nstalled . <br />If we are successful in getting the Contractor to put forth some effort the <br />plant should ~e ready for acceptance t,!ithin 3 weeks. <br />me tc son, ^ . <br />a~~z/3m <br />Attachment <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.