My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1983-01-05 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1980's
>
1983
>
1983-01-05 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:57 PM
Creation date
3/21/2025 1:38:15 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
1/5/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ~ <br />AGREEMENT FOR ENGINEERING SERVICES <br />MADE AND ENTERED INTO by and between the LA PORTE AREA WATER <br />AUTHORITY, hereinafter referred to as the "Authority," and TURNER <br />COLLIE & BRADEN INC „ hereinafter referred to as the "Engineer." <br />1?Ff TT~T C <br />The Authority intends to undertake a Feasibility Study for <br />Long-Range Potable Water Supply, hereinafter referred to as the <br />"Study." The Authority has need of professional engineering and <br />planning services in connection with this study. <br />SECTION I <br />CONTRACTUAL UNDERTAKINGS <br />The Authority agrees to employ the Engineer and the Engineer <br />agrees to perform professional engineering and planning services in <br />connection with the Study, as defined in Exhibit "A" attached hereto <br />and made a part hereof, hereinafter sometimes called "Scope of Work," <br />and for having rendered such services, the Authority agrees to pay <br />to the Engineer compensation as stated in the sections to follow. <br />SECTION II <br />COORDINAT?ON WITH THE AUTHORITY <br />The Engineer shall hold periodic conferences with the Authority <br />or its representatives to the end that the Study, as perfected, shall <br />have full benefit of the Authority's experience and knowledge of <br />• existing needs and facilities and be consistent with its current <br />policies. To implement this coordination, the Authority shall make <br />available to the Engineer for use in performing the Study all existing <br />plans, maps, field notes, statistics, computations, and other data in <br />its possession relative to existing facilities and to the Study. <br />• <br /> <br />z <br />~/ <br />-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.