Laserfiche WebLink
• <br />• <br />selection of materials or equipment, the selection of personnel, <br />or the performance of any other services pursuant to this agree- <br />ment shall in no event exceed the amount of total compensation <br />received by the Engineer for services rendered under this <br />Agreement. <br />Opinions of probable construction cost, financial evalua- <br />tions, feasibility studies, economic analyses of alternate <br />solutions, and utilitarian considerations of operations and <br />maintenance costs prepared by Engineer hereunder will be made <br />on the basis of Engineer's experience and qualifications and <br />represent Engineer's best judgment as an experienced and quali- <br />fied design professional. It is recognized, however, that <br />Engineer does not have control over the cost of labor, material, <br />equipment, or services furnished by others or over market <br />conditions or contractors' methods of determining their prices, <br />and that any utilitarian evaluation of any facility to be con- <br />structed or work to be perfurmed on the basis of the Study must <br />of necessity be speculative until completion of its detailed <br />design. Accordingly, Engineer does not guarantee that proposals, <br />bids, or actual costs will not vary from opinions, evaluations, <br />or studies submitted by Engineer to Authority hereunder. <br />SECTION IV <br />TIME OF PERFORMANCE <br />Engineer shall start performing services hereunder within thirty <br />(30) days after receipt of Authority's written authorization to <br />proceed, which shall be given not later than fifteen (15) days after <br />the effective date of this Agreement. Engineer will submit Prelimi- <br />nary Draft for Authority's review within 180 days of authorization <br />to proceed. The Final Report will be submitted within thirty (30) <br />days of the Technical Review Session. <br />• <br />t <br />~~ <br />•5- <br />