Laserfiche WebLink
r <br />ITEM: STREET MATERIAL <br />• <br />S <br />1. <br />2. <br /> <br />3. <br /> <br /> <br />1982 <br />TEXAS <br />1972 <br />• <br />BROS RADCLIFF <br />INC. <br />1982 ~ 1982 <br />CURRENT ~ <br />ONTRACT <br />APAC TEXAS <br />LED BID #0006 THD SPECS. THD SPECS. SPECS. THD SPECS. <br />a. Hot Mix (MOD D) Deliv. $28.25 $26.00 $23.95 $23.95 $29.50 <br />price per ton <br />b. Hot Mix (MOD D) Picked $24.25 $22.00 $20.00 $20.75 $25:00 <br />up price per toa <br /> <br />a. Asphalt Stabilized Base $26.00 $26.00 $22.95 $23.45 $28.50 <br />(Black Base) Deliv. <br />price per ton <br />b. Asphalt Stabilized Base $22.00 $22.00 $19.00 $20.25 $24.00 <br />(Black Base) Picked up <br />~ _price per ton <br /> ~~~ <br />a. Hot Mix - Cold Laid No Bid ~ No Bid No Bid $28.95 -- <br />Asphalt. Delivered <br />price per ton <br />b. Hot Mix - Cold Laid No Bid No Bid No Bid $26.00 -- <br />Asphalt. Price per <br />ton picked up <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> EA <br />