Laserfiche WebLink
ITEM: RECONSTRUCTION OF <br />NORTH WALL <br />Follis <br />,Constructi n Co. <br />SEALED BID ~~0003 <br />1. _Total of all labor and $90,872.00 <br />material for the recon- <br />struction of the North Wal , <br />interior and exterior, and <br />repair of the air condi- <br />tioning system. <br />2. Alternate Bid: Extension $17,400.00 <br />of gypsum .board to deck <br />in all other exterior wal s <br />of City Hall. <br />3. Estimated Completion Time 90 Days <br />in Days <br /> <br />-1- <br />~-.. <br />--{- <br />-r- <br />~- <br />-~- <br />-~ <br />. i <br />