Laserfiche WebLink
<br />ZI-2 <br />• <br />plan proposes the diversion of flow to the La Porte main plant <br />in two years, existing noncompliance should cease upon comple- <br />tion of the diversion in February 1986. <br />(4) The City of La Porte plans several measures to reduce <br />the noncompliant discharge during the interim period of design <br />and construction of the proposed diversion and trunk sewers. <br />These include altering pump station controls to equalize exist- <br />ing hydraulic and organic loading, adding polymer feed facilities <br />to enhance solids separation and increasing chlorine feed concen- <br />tration. The noncompliant discharge will be eliminated following <br />diversion of the College View service area to the enlarged La <br />• Porte wastewater treatment facilities. <br />(5) Recurrent conditions of noncompliant discharges will <br />not occur following diversion of the College View treatment <br />plant influent. <br />Table 2 summarizes the above mentioned steps and presents <br />an approximate time schedule for their implementation. <br /> <br />TumerCollie~Brackn inc. <br />