My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1984-08-01 Regular Meeting (2)
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1980's
>
1984
>
1984-08-01 Regular Meeting (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:59 PM
Creation date
3/21/2025 1:40:28 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
8/1/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t ~~ <br /> <br />Cl'I'Y OF LA PUR'1'}~, <br />INTER-OFFICE MEMORANDUM <br />T0: Jerry Hodge, Direct~oJr of, Public Works DATE: July 27, 1981+ <br />FROM: Luther Maxey, s~j~sPublic Works Director <br />SUBJECT: Emergency Sewer Work in Alley Between First and Broadway at the <br />First Baptist Church <br />The subject sewer main is the original northern section of. the recently replaced <br />sewer line south of the First Baptist Church. It is a concrete line, 11 to <br />12 feet deep, that has been in service for longer than 30 years. The joints <br />are open and the top half of the pipe is missing in numerous areas. The <br />sewer cleaner could not pass through the line to adequately x•espond to <br />complaints of sewer stoppage. We found. that mud. and sections of the pipe <br />were falling into the flow line and causing stoppage. Additionally, the <br />• water blast of the sewer cleaner would cause more material to break free to <br />plug the sewer flow. <br />• City crews started the replacement project, however, due to the wet subsurface <br />from the open pipe, the.equipment and crew could not cope with the unstable <br />soil. After several cave-ins, I was afraid for 'the lives of the crew, <br />damage to the City equipment and possible damage to adjacent building slabs. <br />McKey Construction, Inc. was contacted to assist with a large backhoe, <br />adequate shoring materials and a crew experienced in working unstable anal <br />caving soil. . <br />To complete the project the sewer. pipe was halved to 10 foot joints, in lieu <br />of standard. 20 foort joints and placed between solid shoring. City crews will <br />complete the cleanup. <br />The charges from McKey Construction were $15,330.31. <br />If you should have any questions, please advise. <br />LM/lw <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.