Laserfiche WebLink
<br />Division of Public Works <br />• Mr. Jerry Hodge <br />July 19, 1984 <br />Page 4 <br />• <br />Woodward•Clyde Consultants <br />Based on our experience, costs for such studies typically range from <br />$1,500 to $2,000 per boring including geophysical logging and our <br />report. We anticipate that the costs to conduct the study at and <br />adjacent to the proposed landfill site then might range from $10,000 to <br />$40,000. The magnitude of the second phase study would depend entirely <br />on the reason for conducting the study. <br />If a second phase study becomes necessary, the anticipated time required <br />to complete the study would be 4 to 6 weeks. <br />In summary, we anticipate the geotechnical engineering study for this <br />permit application will require a budget in the range of $20,000 to <br />$35,000. Additional gathering and interpretation of data relative to <br />non-existence of active growth faults on this site may require an <br />additional $1,500 to $3,000. If, in defense of the permit application, <br />a second phase fault study is required, it should be budgeted at $10,000 <br />to $40,000. <br />We look forward to providing these services for you. If you have <br />• questions or require additional information, please call. <br />Respectfully yours, <br />~~ <br />B. Rent Merritt, P.E. <br />Project Manager <br />Reviewed by: <br />~G~~~ <br />L. A. Wol skill, P.E. <br />Principal <br />BRM:LAW:cjs <br />• <br />