Laserfiche WebLink
• • • <br />Woodward•Clyde Consultants <br /> <br />GEOTECHNiCAL ENGINEERING BUDGET - ATTACHMENT 11 <br />FIELD INVESTIGATION <br />• <br />Mob/Demob (1 mob./demob.) Est. <br />Borings (I1-14 borings) <br />o Continuous Sampling, 0-15', <br />150-200 ft @ $12.00/ft <br />o Continuous Sampling, 15'-50', <br />50-130 ft @ $14.25/ft <br />o Intermittent Sampling, 0-75', <br />40-100 ft @ $9.25/ft <br />Monitoring Wells (3-4 wells) <br />o Reaming of borehole, 75-100 ft. @ $5.00/ft <br />o Materials, Est. @ $175/well <br />o Installation, 12 to 16 hrs @ $55.00/hr <br />Field Resistivity Survey (May not be required) <br />o Resistivity Equipment, 1 wk. @ $150.00/wk <br />o Resistivity Technician/Geologist, <br />11 man-days @ $500.00/day <br />Field Engineering <br />o Project Manager, 8 hrs @ $75.00/hr <br />o Staff Engineer, 5-7 man-days @ $450.00/day <br />Subtotal - Field <br />$ 800.00 <br />1,800.00 - 2,400.00 <br />712.50 - 1,852.50 <br />370.00 - 1,110.00 <br />375.00 - 500.00 <br />525.00 - 700.00 <br />660.00 - 880.00 <br />0 - 150.00 <br />0 - 5,500.00 <br /> 600.00 <br />500.00 - 1,000.00 <br />$ 6,342.50 - $15,492.50 <br />* As with the preliminary site study, we have assumed that surveying and <br />any special equipment necessary for site access will be supplied by others. <br />LABORATORY TESTING <br />o Index Tests, Est. @ $5.00/ft <br />o Standard Proctor Tests, 2-4 tests <br />o Falling Head Permeability Tests, <br />12-16 tests <br />Subtotal - Laboratory <br />$ 1,300.00 - 2,150.00 <br />200.00 - 400.00 <br />1,L200.00 - 1,600 00 <br />$ 2,700.00 - 4,150.00 <br />• Page 1 of 2 <br />