Laserfiche WebLink
III-4 <br />TABLE III-1 - PROBABLE COST SUMMARY <br />(All Costs in Thousands of 1987 Dollars) <br />Treatment <br />Facility in Treated Water Treated Water <br />La Porte using from Southeast from Big 3 <br />CIWA Water Treatment Plant Industries <br />Construction Cost <br />of Water Treatment <br />Plant & Pump Station 6,298 8,714* 2,071 <br />Construction Cost of <br />Water Supply Line 0 2,128 0 <br />Construction Cost of <br />Water Transmission <br />Line 3,575 3,235 3,256 <br />Engineering Cost 691 355* 372 <br />TOTAL CONSTRUCTION <br />& ENGINEERING COST 10,564 14,432 5,699 <br />Annual Treatment <br />Plant & Pump Station <br />O&M Cost <br />528 <br />905 <br />528 <br />Annual Pipeline <br />O&M Cost <br />36 <br />52 <br />32 <br />Annual Raw Water <br />Cost <br />1,010 <br />1,010 <br />11010 <br />TOTAL ANNUAL COSTS <br />1,574 <br />1,967 <br />1,570 <br />*Treatment plant engineering costs included as part of construction costs. <br />TumerCollie cOBradenInc <br />