Laserfiche WebLink
• • <br /> <br />TurnerCollie c~Braden Inc. <br />July 15, 1985 <br />Mr. Jack Owen <br />City of La Porte <br />Page Two <br />Of the two <br />reinforced <br />(RPM) , only <br />time. <br />pipe materials being considered for this project, <br />concrete pipe (RCP) and reinforced plastic mortar <br />the RCP is available within 2-3 weeks delivery <br />We recommend that the City award a contract for construction <br />of the proposed sewer line under S.H. 146 by Friday, July 26, <br />1985, using the Class III RCP thick wall pipe with calcareous <br />aggregate, with a construction time of 35 days. Since there <br />is not adequate time for a normal 2-3 week advertising period, <br />we suggest that closed bids be obtained from two or more <br />qualified contractors by Tuesday, July 23, 1985, so that a <br />contract can be awarded by the following Friday. <br />We will prepare the necessary documents to receive bids on <br />this work at your direction. Please give me a call if you <br />have any questions. <br />~~ ~~_ <br />obert C. each, P.E. <br />Project Manager <br />Very truly yours, <br />RCR:lf <br />cc: Cecil Allen <br />Jerry Hodge <br />John Joerns <br />