Laserfiche WebLink
• <br /> <br />H. CECIL ALLEN <br />VICE PRESIDENT <br />TurnerCollie~Braden Inc. <br />July 25, 1985 <br />City of La Porte <br />P. O. Box 1115 <br />La Porte, Texas 77571 <br />PO BOX 13089 <br />HOUSTON, TEXAS 77219 <br />5757 WOODWAY <br />713 780.4100 <br />TELEX 774185 TCB HOU <br />Re: Construction of Fairmont Parkway Relief Sanitary Sewer <br />S.H. 146 Crossing <br />Recommendation of Award <br />Turner~Collie & Braden Project No. 13-02000-032 <br />Gentlemen: <br />Sealed bids, addressed to the City of La Porte, were received <br />at City Hall, La Porte, Texas on July 24, 1985. Bids received <br />are as shown on the attached Bid Tabulation. Please note that <br />two of the three bidders qualified their proposal, indicating <br />a construction time in excess of the specified time. <br />After tabulation and review of all bids received, and since <br />construction time is critical, it is our recommendation that <br />the project be awarded on the basis of the lowest bid without <br />qualifications, in the amount of $194,995.00. No substitutions <br />were offered, therefore the Contract Amount will be $194,995.00. <br />ery truly yours, <br />H. Cecil Allen, P.E. <br />Project Director <br />HCA:GOP:lf <br />Enclosure <br />CONSULTING ENGINEERS • TEXAS AUSTIN/DALLAS/EL PASO/HOUSTONlPORT ARTHUR COLORADO DENVER/GRAND (UNCTION <br />