Laserfiche WebLink
• CITY OF LA PORTE • <br />INTER-OFFICE MEMORANDUM <br />T0: Jack Owen, City Manager <br />FROM: John Joerns, Director of Commun evelopment <br />Bob Speake, City Engineer ~r~ <br />DATE: May 7, 1986 <br />SUBJECT: Proposed Water Line Extension to Block 759 <br />SYNOPSIS <br />The owners of the lots in Block 759 have petitioned the City for a <br />water main extension serving their property. Staff has determined <br />that the most practical means of providing water service to this block <br />is by extending the existing 2" water line on South 15th Street north <br />from its present termination point at West "D" Street. Estimated cost <br />of $3400 would be paid in advance of construction by the petitioners. <br />Staff recommends Council approval of the 2" extension. Staff also <br />recommends extension of a 6" main from 16th Street to improve fire <br />protection for the area. The 6" extension would cost the City about <br />$6300. <br />BACKGROUND <br />1. In 1984, Council heard a request for water and sewer service from <br />Alfred Garcia, owner of Lots 17-20, who has since sold his <br />property. Council deferred action (on Mr. Garcia's request) to <br />develop a new policy on such extensions. Mr. Garcia did not <br />follow up on his request. Informal discussions between staff and <br />one of the other lot owners (Alice Ybarra) since 1984 have <br />resulted in this petition (Exhibit A). <br />2. Existing and proposed utilities around Block 759 are shown on <br />Exhibit B. All lots in the block are sewer-served except Lots <br />17-20. No lots in Block 759 are currently served by a water <br />main, although the Bryan residence is served by a service line <br />from 16th Street. Streets exist only on the west and north sides <br />of the block <br />