My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1987-06-08 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1980's
>
1987
>
1987-06-08 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:00 PM
Creation date
3/21/2025 1:42:10 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
6/8/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br /> <br />~"` -::. ` <br />CITY OF LA PORTE <br />INTER-OFFICE MEMORANDUM <br />~a~ <br />T0: Robert r ra, City Manager DATE: June 1, 1987 <br />FROM: Steve i , Public Works Director <br />SUBJECT: REQUEST FOR ADDITIONAL AUTHORIZATION <br />RE: FAIRMONT PARKWAY RELIEF SANITARY SEWE R <br />REVISIONS BETWEEN 16TH STREET AND LIFT~STATION ~~ 29 <br />On August 11, 1986, Turner Collie & Braden submitted', a request for <br />authorization and payment for Special Services, in t~!he amount of <br />$4,600 for the above referenced project. The requeslt was in <br />response to the concern with obtaining easements through privately <br />owned property west of 17th Street, as shown on the~~;original <br />approved plans for this project. The plans were rea,ised to .route <br />the line down 16th Street to Fairmont Parkway, and t~ihe contractor <br />is nearing completion. <br />At the time of this request, City Staff raised quesf,ions about the <br />amount of time and effort needed to change the route. Requests <br />were made to Turner Collie & Braden to provide additional backup <br />material to support the request. Since that time, due in part to <br />various changes in both City and TC&B staff, the matter has been <br />neglected. <br />After a meeting between City staff and TC&B on April' 27, 1986, <br />TC&B submitted further documentation to support the ;time and <br />effort expended to calculate its proposed fee. Numerous meetings <br />including three with the affected property owner, the route <br />surveyor, the railroad, and various pipeline companies were <br />necessary to reroute the project.. Also included were engineer and <br />draftsman manhours necessary to redesign and revisejcontraet <br />drawings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.