Laserfiche WebLink
. ~ • <br />Y <br />Director Of Works <br />Page 2 .~ _ <br />sure of 2950 lbs. The anticipated operating pressure will be <br />approximately 800 lbs., with a maximum car~c-odity temperature of 85 <br />degrees, fahrenheit. <br />_,. .. _ <br />I am also enclosing Amoco's draft #12046, in the amount of $300.00, <br />in <br />_payment of the initial permit fee for these crossings. <br />If any~~further information is required, or, there are any questions, I <br />-.can be reached at the above address, where my telephone number is <br />- 817/878-6143. We anticipate construction to begin on this project the <br />.first week of July, with all construction complete, and the line opera- <br />tional by October 1, 1987. <br />Very truly yours, <br />J es A. R <br />Right Of-Way Superv ' . r <br />JAR/jr <br />Encl.osur es <br />s,,~. _ _ <br />~.. <br />4:. _ . <br />,,, <br />~. <br />~~y } ' <br />'.,.~ ,r <br />