Laserfiche WebLink
• <br />TurnerCollie c~Brad~n Inc. <br />June 23, 1987 <br />Mr. Bob Herrera, City Manager <br />City of La Porte <br />Page Three <br /> <br />(d) Add one (1) each 48-inch diameter fiberglass manhole, <br />depth exceeding 12 feet, but .not greater than 15 feet. <br />As a result of this modification,. change the contract <br />quantity for line item 30B from one (1) each to two <br />(2) each. <br />The addition of one (1) each 48-inch diameter fiberglass <br />manhole to line item 30B will result in a contract price <br />increase of two thousand eight hundred dollars and no <br />cents. $2,800.00 <br />(e) Add six hundred fifty-four (654) lineal feet of 8-inch <br />-PVC gravity sanitary sewer, in open cut, 0-8 feet in <br />depth CIP. As a result of this modification, add <br />line item 57 to the contract proposal as follows: <br />Line Item 57 <br />Contract Contract Contract <br />Description Unit Quantity Price Amount <br />Install 8-inch PVC L.F. 655 $12.00 $7,860 <br />sanitary sewer, in <br />open cut, 0-8 feet <br />in depth, CIP <br />The addition of line item 5? will result in a contract <br />price increase of seven thousand eight hundred sixty <br />dollars and no cents. $7,860.00 <br />(f) Add one hundred seventy-four (174) lineal feet of <br />8-inch PVC gravity sanitary sewer, in open cut, <br />8-10 feet in depth, CIP. As a result of this <br />modification, add line item 58 to the contract <br />proposal as follows: <br />Line Item 58 <br />Contract Contract Contract <br />Description Unit Quantity Price Amount <br />Install 8-inch PVC L.F. 174 $12.75 $2,?18..50 <br />gravity sanitary <br />sewer, in open cut, <br />8-10 feet in depth <br />CIP <br />