My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1987-07-27 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1980's
>
1987
>
1987-07-27 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:00 PM
Creation date
3/21/2025 1:42:19 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/27/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />r-_ <br /> <br />H. CARLOS SMITH <br /> <br />"Tuly 20, 1987 <br /> <br />ENGINEERS AND SURVEYORS, INC. <br />718 SOUTH BROADWAY <br />P. O. BOX M <br />LAPORTE. TEXAS 77571 <br /> <br />PHONE AIC 713 471-4226 <br /> <br />City of La Porte <br />P. O. Box 1115 <br />La Porte, Texas 77571 <br /> <br />Attn: Mr. Bob Herrera <br />City Manager <br /> <br />Dear Mr. Herrera: <br /> <br />We propose to render professional engineering services in <br />connection with the Street Paving and Drainage, and Utility <br />Adjustments on East "E" Street, Our Job No. 2122-87, <br />(hereinafter called the "Project"). You are expected to furnish <br />us with full information as to your requirements including any <br />special or extraordinary consideration for the Project or special <br />services needed, and also to make available pertinent existing <br />data. <br /> <br />Our proposal is more fully described as follows: <br /> <br />I . SCOPE OF WORK <br /> <br />The scope of work involves the Preliminary Engineering <br />Phase, and the Design Phase for the reconstruction of East "E" <br />Street from San Jacinto Avenue to Park Avenue as a reinforced <br />concrete roadway with curbs and all necessary storm drainage <br />improvements. The scope of work shall also include the location <br />and identification of all utilities within the right-of-way and <br />the investigation of these utilities for interference with the <br />proposed improvements. <br />The scope of work will consist of the preparation of a <br />preliminary engineering report outlining recommendations of the <br />Engineer; complete design including preparation of plans and <br />specification for the roadway construction and the replacement, <br />relocation or re-routing of any City utilities; the <br />identification of any public utilities interfering with the <br />proposed improvements and the notification of these utility <br />companies; the identification of all agencies requiring plan <br />review and approvals and assistance to the City in obtaining <br />permits and plan approvals from these agencies. <br />All plans and specifications shall be in complete form ready <br />for public bidding. <br /> <br />Page 1 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.