Laserfiche WebLink
Handout ~r City Council Workshop ~1 16, 1990 <br />r Item - Front Foot Fees <br />~~ <br />RESIDENTIAL <br />Water <br />Current Fees ($ 1.44/120 sq. ft.) <br />$ 1.20/100 sq. ft. <br />Typical Lot and <br />block example $ 4.60/100 sq. ft. <br />COr'IMERCIAL <br />Water <br />Current Fees ($ 1.73/120 sq. ft.) <br />$ 1.44/100 sq. ft.) <br />Commercial <br />(smaller parcels $ 7.91/100 sq. ft. <br />example) <br />Commercial <br />Strip Development <br />(full block(s) <br />example) $ 6.18/100 sq. ft. <br /> <br />Sewer <br />($ 2.30/120 sq. ft.) <br />$ 1.92/100 sq. ft. <br />$ 6.12/100 sq. ft. <br />Sewer <br />($ 2.88/120 sq. ft.) <br />$ 2.40/100 sq. ft. <br />$ 8.52/100 sq. ft. <br />$ 3.77/100 sq. ft. <br />Consider Interim <br />Front Foot Fees <br />(for approximate 6 month period) <br />Commercial <br />$ 7.30/100 sq. ft. <br />$ 7.00/100 sq. ft. <br />Residential* <br />$ 4.60/100 sq. ft. <br />$ 6.10/100 sq. ft. <br />* Consider for residential lots greater than one acre in size a minimum. <br />of 10,000/sq. ft. <br />