My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1992-02-24 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1990's
>
1992
>
1992-02-24 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:03 PM
Creation date
3/21/2025 1:47:50 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
2/24/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br />III. SCHEDULE <br />The Engineer is ready, willing and able to start work <br />immediately upon receipt of a signed contract with the City on <br />this project. Anticipated schedule of completion of each phase <br />is as outlined below, based on working days. <br />A. Preliminary Engineering Phase <br />1. Field Surveys 3 days <br />2. Preparation of Preliminary <br />design, plan, and documents 10 days <br />ESTIMATED TIME 13 days <br />B. Final Design Phase <br />1. Final Field Surveys <br />2. Preparation of Preliminary <br />Contract Documents, etc. <br />3. Preparation of Final <br />Contract Documents <br />ESTIMATED TIME <br />C. Construction Phase <br />1. Contract Administration <br />ESTIMATED TIME <br />TOTAL ESTIMATED TIME <br />1 day <br />20 days <br />4 days <br />25 days <br />10 days <br />10 days <br />48 days <br />IV. COMPENSATION <br />A. Preliminary Engineering Phase: <br />Engineering fee based on per diem rates and man hours <br />expended on the project estimated at $ 5,200.00 . <br />B. Design Phase: <br />Engineering fee based on per diem rates and man hours <br />expended on the project estimated at $ 6,400.00 . <br />Page 5 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.