My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1992-02-24 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1990's
>
1992
>
1992-02-24 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:03 PM
Creation date
3/21/2025 1:47:50 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
2/24/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br />H. CARLOS SMITH <br />ENGINEERS AND SURVEYORS, INC. <br />423 N. HWY. 146 P.O. BOX 529 (713) 471-4226 <br />LA PORTE. TEXAS 77572-0529 <br />3anuary 31, 1992 <br />City of La Porte <br />P. 0. Box 1115 <br />La Porte, Texas 77572-1115 <br />Attn: Mr. Bob Herrera <br />City Manager <br />Re: East H Street Improvements <br />Dear Mr. Herrera: <br />We propose to render professional engineering services in <br />connection with the East H Street Improvements. You are <br />expected to furnish us with full information as to your <br />requirements including any special or extraordinary consideration <br />for the Project or special services needed, and also to make <br />available pertinent existing data. <br />Our proposal is more fully described as follows: <br />I. SCOPE OF WORK <br />The scope of work involves the Preliminary Engineering <br />Phase, Design Phase and the Construction Phase for the <br />replacement and re-routing of approximately 1,050 feet of <br />sanitary sewer line, including service lines and all <br />appurtenances there-to; the removal and replacement of <br />approximately 3,000 square yards of reinforced concrete pavement <br />with curbs; the lime stabilization of approximately 3,500 square <br />yards of subgrade; the removal and replacement of approximately <br />13 storm water inlets; the investigation and repair of <br />approximately 1,100 linear feet of storm sewer line of various <br />sizes; the removal and replacement of approximately 250 square <br />yards of asphalt transitions and including the final grading and <br />clean up of the construction area. <br />The scope of work will consist of the preliminary <br />engineering phase including consultations with the Owner, or his <br />representatives, to determine the extent of the project, prepare <br />preliminary design criteria, preliminary drawings and outline <br />specifications, and a preliminary cost estimate, and outlining <br />recommendations of the Engineer; complete design including <br />preparation of plans and specification for the construction of <br />the improvements, the identification of any public utilities <br />interfering with the proposed improvements and the notification <br />of these utility companies; the identification of all agencies <br />requiring plan review and approvals and assistance to the City in <br />obtaining permits and plan approvals from these agencies. <br />Assist the City in advertising, receiving and analyzing bids <br />from contractors for the construction of the Project, awarding of <br />contract, preparation of contract documents and perform contract <br />administration during construction. <br />Page 1 of lA <br />
The URL can be used to link to this page
Your browser does not support the video tag.