My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1992-06-22 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1990's
>
1992
>
1992-06-22 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:03 PM
Creation date
3/21/2025 1:48:14 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
6/22/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM CLRUNCH & MILLER. INC. <br />+ r : ~.~yj <br /> <br />06.17.1992 10s20 N0. 3 P. 5 <br />• <br />i.`ONSTRUCTION OB 'j'rnN r7F QttA~7~CTli'l~ gY THE CITY) <br />o Provide a Project representative to observ® and monitor the <br />progress and quality of the work by the Contractor. <br />o Provide daily reports on the status of the construction, <br />o Take color photographs of the Projaat's site prior to <br />construction. <br />o Participate in the processing of submittals and chango orders <br />and the issuance of instructions as required by the City. <br />o "Additional Services" shall only be performed when directed by <br />the City to CMI. These services are not considered normal or <br />customary engineering services. <br />o Services resulting from significant changes in the extent of <br />the Project or its design including but not limited to changes <br />. in size, coaaplexity, the City's schedule, or character. of <br />construction or method of financing; and revising previously <br />accepted studies, reports design documents or Contract <br />Documents when such revisions are due~to causes beyond CMI's <br />control. <br />o Preparing documents for alternate bids requested by the City <br />for Contractor(s) work which is not executed or documents for <br />out of sequence work. <br />o Preparing to serve or serving as~a consultant or witness for <br />the City in any litigation, public hearing or other legal or <br />administrative proceeding involving the Project, <br />o Additional or extended services during construction made <br />necessary by (1) work damaged by fire or other cause during <br />construction, (2) ~a significant amount of defective or <br />neglected work of Contractor(s), (3) prolongation of the <br />construction contract time, (4) acceleration of the progress <br />schedule involving services beyond normal working hours and (5) <br />default of contractor <br />CMI will endeavor to apprise the City of any potential <br />additional or extended services which may result from the above <br />listed 5 items, prior to CMI's expenditure of time on such <br />services. As previously noted, any such extended or additional <br />services shall only be performed when directed by the City to <br />CMI. <br />o Additional services not otherwise provided for in the scope of <br />services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.