Laserfiche WebLink
C~ <br />CITY OF LA PORTE <br />~~ <br />INTER OFFICE MEMORANDUM <br />June 9, 1992 <br />TO: Robert T. Herrera, City Manager <br />~'' <br />FROM: Charles Harrington, Director of Plann g <br />Fred Thompson, City Engineer ,'~~ ~ <br />t D' rector of Public ~iior-ks <br />Steve Gillet i <br />SUBJECT: Evaluation of Qualification Statements <br />Professional Engineering Services <br />Farrington Waterline Replacement Project <br />The City of La Porte solicited Qualification Statements from three <br />(3) firms to provide professional engineering servi_res for the <br />construction of the Farrington Waterline Project. The Statements <br />were evaluated by the above referenced committee, and the results <br />of the evaluation are tabulated on Attachment A. <br />The Committee evaluated the Statements based on the firms' .response <br />to the Requests for Qualifications, using the Evaluation Criteria <br />outlined in the Request (Attachment A). Based on the firms` <br />response, Claunch & Miller, Inc. (Firm A) was selected as the top <br />respondent. <br />It is recommended that the City negotiate a contract with Claunr_h <br />& Miller, Inc. to provide professional engineering services for the <br />construction of the Farrington Waterline replar_ement Project. <br />Attachments <br />ac: John Joerns, Assistant City Manager <br />