Laserfiche WebLink
• <br />Page 3 of 4 <br />Planning & Zoning Commission <br />SCU92-002 <br />Existing on -site parldng should be adequate for both <br />Stone Castle and Barrett's ongoing operation. This <br />business should have little impact on existing traffic <br />volume or patterns. <br />B. Drainage: <br />This is an existing facility. No building additions or site <br />modifications are proposed. Drainage is not applicable <br />to this request. <br />C. Compatibilily with Surrounding Area: <br />The facility is located in a relatively undeveloped Light <br />Industrial zone. As noted, all storage and processing will <br />take place indoors. There should be no incompatibility <br />with the surrounding area. <br />D. Required Licenses Obtained: <br />If the requested Conditional Use Permit is approved, the <br />applicant will have to obtain a City Zoning Permit and <br />a City Industrial Waste Permit. These are the only <br />operating permits required for this type of business. <br />E. Availability and Adequacy of Public Services: <br />Utilities and services currently available to the rear <br />structure appear to be adequate. Both of Barrett's <br />buildings are supplied with water from a single meter. <br />They also share a common sewer tap. The property is <br />to remain under single ownership. Stone Castle is <br />leasing not purchasing the rear building. Stone Castle's <br />manufacturing process does not rely heavily on water. <br />The primary water and sewer demand will be to <br />accommodate the sanitary needs to the approximately <br />five employees to be working out of the building. The <br />building does have its own restrooms. Impact on water <br />and sewer systems should be minimal. <br />