My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1993-05-24 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1990's
>
1993
>
1993-05-24 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:04 PM
Creation date
3/21/2025 1:48:56 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
5/24/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />STP 93(134)MM <br />0502-01-132 <br />Harris County <br /> <br />STATE OF TEXAS <br /> <br />COUNTY OF TRAVIS <br /> <br />THIS AGREEMENT is made this <br /> <br />day of <br /> <br />, 1993, by and between the City <br /> <br />of La Porte, Texas, hereinafter called the "City", Party of the First Part, acting by and <br /> <br />through its City Council and the State of Texas, hereinafter called the "State", Party of the <br /> <br />Second Part, acting by and through its Texas Department of Transportation Commission. <br /> <br />WHEREAS, the City desires participation in sanitary sewer and water main <br /> <br />adjustments and incidental items within the limits from 1.28 miles East of State Highway <br /> <br />No. 134 to 0.837 mile West of State Highway No. 146 on State Highway No. 225, which <br /> <br />is solely the City's responsibility and the City has requested the State to construct or have <br /> <br />constructed this work. The State will construct or have constructed this work for and on <br /> <br />behalf of the City and at the Cityls sole expense, excluding preliminary engineering. The <br /> <br />estimated construction cost of this work is One Hundred Forty Seven Thousand Nine and <br /> <br />39/100 Dollars ($147,009.39), including contingencies and construction engineering, and <br /> <br />including indirect costs at the rates in effect for the fiscal years during which the work is <br /> <br />accomplished. The indirect cost rate will be based on the Texas Department of <br /> <br />Transportation's Indirect Cost Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.