My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1997-06-23 Regular Meeting of City Council
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1990's
>
1997
>
1997-06-23 Regular Meeting of City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:08 PM
Creation date
3/21/2025 1:52:29 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
6/23/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~T FOR CITY COUNCIL AGENDA~ <br /> <br />Agenda Date Requested: June ~~~997 <br />Requested By: S. Gillett ~ Department: <br />Report Resolution <br /> <br />Public Works <br /> <br />xxxx <br /> <br />Ordinance <br /> <br />Exhibits: Ordinance No. 97- <br />Engineer's Recommendation <br />Bid Tabulation <br /> <br />SUMMARY & RECOMMENDATION <br /> <br />The Flow Splitter Chamber at the Little Cedar Bayou Wastewater Treatment <br />Plant is scheduled for repairs due to hydrogen sulfide deterioration to the <br />concrete walls and roof. Carter & Burgess (Engineer) was retained to <br />determine the cause of the damage and to design repairs to halt corrosion <br />and prevent future events. A total of $64,000 was budgeted for the repair <br />in the utility CIP Fund. A total of $16,000 is authorized for engineering, <br />testing, inspection and construction administration, leaving a total of <br />$48,000 for construction. <br /> <br />Bids were received on June 12, 1997 from two (2) bidders. Low bid was <br />received from B-5 Construction, Inc. in the amount of $46,043.00. This <br />firm has extensive experience with rehabilitation of concrete structures in <br />the City of Houston. It is recmmended tha~ the contract be awarded to B-5 <br />Construction, Inc. in the amount of $46,043.00, with the remaining <br />$1,957.00 authorized for a contingency. <br /> <br />Action Required by Council: Approve Ordinance No. 97- authorizing the <br />City Manager to execute a contract with B-5 Construction, Inc. in the <br />amount of $46,043.00, with the remaining $1,957.00 for contingency. <br /> <br />Availability of Funds: <br /> <br />xxxx <br /> <br />General Fund <br />Capital Improvement <br />Other <br /> <br />Water/Wastewater <br />General Revenue Sharing <br /> <br />Account Number: 003-9890-741-1100 <br /> <br />Funds Available: -2QLYES <br /> <br />NO <br /> <br />ApDroved for city Council Agenda <br /> <br />~~T~ <br />Robert T. Herrera <br />City Manager <br /> <br />to.:.19 ~., <br />DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.