Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />SUMMARY PAPER <br /> <br />Bay Area Blvd. <br /> <br />Joint Venture with Harris County Precinct Two to build <br />Bay Area Extension (Sens Road) <br /> <br />Proiect Scope <br /> <br />Limits: Spencer Highway to Fairmont Parkway <br /> <br />Length: 0.95 miles <br /> <br />Description: 5-lanes concrete, curb and gutter, storm sewer and <br />related outfall (new) <br /> <br />ROW 100 feet proposed <br /> <br />Estimated Proiect Costs <br /> <br />Construction: <br /> <br />$4,400,000.00 <br /> <br />Engineering Services: <br /> <br />670,000.00 <br /> <br />Utilities (14 pipelines) <br /> <br />1,250,000.00 <br /> <br />ROW (14.23 acres) ($3.00/sq.ft.) <br /> <br />1.860.000.00 * <br /> <br />Total Cost <br /> <br />58,180,000.00 <br />.... 58.2 million <br /> <br />City's Portion of Joint Venture <br /> <br />~ construction <br />~ engineering <br />~ utilities (14 pipelines) <br /> <br />$2,200,000.00 <br />335,000.00 <br />625.000.00 <br /> <br />Total Construction <br /> <br />$3,160,000.00 ** <br /> <br />Credit Existing ROW (3.00/sq.ft.) <br /> <br />- 1.705.243.00 <br /> <br />Total La Porte Contribution <br /> <br />51,454,757.00 <br /> <br />FOOTNOTES: <br /> <br />1) · Potential problems - pipeline adjustments and outfall drainage. <br />2) .. City already has obtained 13.049 acres of ROW in anticipation of this project. <br />