My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1998-5-11 Special Called Regular and Workshop Meeting of City Council
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1990's
>
1998
>
1998-5-11 Special Called Regular and Workshop Meeting of City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:10 PM
Creation date
3/21/2025 1:54:45 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
5/11/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />SUMMARY PAPER <br /> <br />Bay Area Blvd. <br /> <br />Joint Venture with Harris County Precinct Two to build <br />Bay Area Extension (Sens Road) <br /> <br />Proiect Scope <br /> <br />Limits: Spencer Highway to Fairmont Parkway <br /> <br />Length: 0.95 miles <br /> <br />Description: 5-lanes concrete, curb and gutter, storm sewer and <br />related outfall (new) <br /> <br />ROW 100 feet proposed <br /> <br />Estimated Proiect Costs <br /> <br />Construction: <br /> <br />$4,400,000.00 <br /> <br />Engineering Services: <br /> <br />670,000.00 <br /> <br />Utilities (14 pipelines) <br /> <br />1,250,000.00 <br /> <br />ROW (14.23 acres) ($3.00/sq.ft.) <br /> <br />1.860.000.00 * <br /> <br />Total Cost <br /> <br />58,180,000.00 <br />.... 58.2 million <br /> <br />City's Portion of Joint Venture <br /> <br />~ construction <br />~ engineering <br />~ utilities (14 pipelines) <br /> <br />$2,200,000.00 <br />335,000.00 <br />625.000.00 <br /> <br />Total Construction <br /> <br />$3,160,000.00 ** <br /> <br />Credit Existing ROW (3.00/sq.ft.) <br /> <br />- 1.705.243.00 <br /> <br />Total La Porte Contribution <br /> <br />51,454,757.00 <br /> <br />FOOTNOTES: <br /> <br />1) · Potential problems - pipeline adjustments and outfall drainage. <br />2) .. City already has obtained 13.049 acres of ROW in anticipation of this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.