My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1999-02-01Special Called Workshop of City Council
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
1990's
>
1999
>
1999-02-01Special Called Workshop of City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:11 PM
Creation date
3/21/2025 1:55:00 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
2/1/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DRAFT <br /> <br />e <br /> <br />e <br /> <br />implement the Zone Project Plan and Reinvestment zone Financing <br />Plan. <br /> <br />b. Any additional land use component shall include a description of <br />the proposed land use regulations, a description of the economic <br />and financial need for each land use regulation and a description of <br />the effect of the comprehensive plan on the economic integrity of <br />the Zone Project Plan and Reinvestment zone financing Plan. The <br />land use component shall be reviewed annually by the Zone's <br />board to ensure that both the public and private investment in the <br />Zone are protected, and if additional restrictions are required, may <br />approve amendments and changes for City council review and <br />approval. <br /> <br />c. The Land Use Plan may impose maximum height, minimum square <br />footage on new construction, maximum lot coverage and bulk <br />restrictions to provide for sufficient private investment in the Zone's <br />development or redevelopment to support Zone bonds, notes or <br />obligations. <br /> <br />d. Lawful nonconforming uses in Zones may be terminated as follows: <br /> <br />1. when then use ceases or is abandoned; or <br /> <br />2. when the primary structure has been demolished or when <br />rehabilitation in excess of 50% of the assessed value of the <br />improvement at the time of Zone creation is completed; or <br /> <br />3. when a sufficient period of time has elapsed to allow the <br />recovery of the owner or owners investment in the <br />nonconforming use or uses <br /> <br />e. Nonconforming uses may not be altered or expanded in area of <br />intensity in any residential area in the Zone (e.g. no additional new <br />smployees, outside storage or parking may be created). <br /> <br />f. Any additional land use controls shall be operative for at least the <br />life of the Zone, and the Board may, with City Council approval, <br />provide that a restriction adopted by the Board continues in effect <br />after the termination of the Zone. If the land use controls continue <br />after the termination of the Zone, such restrictions shall be treated <br />as if adopted by the City in the first instance. <br /> <br />g. The Board shall contract with the City for the purpose of <br />snforcement of any additional land use controls authorized for use <br />in the Zone. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.