Laserfiche WebLink
• • <br />REQUEST FOR CITY COUNCIL AGENDA ITEM <br />i <br />Agenda Date Requested: November 9 <br />Requested By: S. Gillett partment: Public Works <br />Report Res ution XXX Ordinance <br />Exhibits: Ordinance No. 99- <br />Proposal and Agreement for Engineering Services <br />SUMMARY & RECOMMENDATION <br />The 1999-2000 Utility Capital Improvement Fund includes the replacement of 2,150 feet of 8" waterline and sidewalk <br />along Catlett. Additionally; approximately 2,000 feet of waterline remains to be replaced on Park Street, which was <br />begun in the last fiscal year. The estimated construction costs total $316,775. A total of $300,000 is budgeted for the <br />design and construction of this Project. <br />The most recent waterline replacement project came in significantly under budget. It is possible that similar pricing will <br />again be bid. The original intent of the Department was to construct the remainder of Park Street waterline in-house. <br />However, if favorable pricing is obtained, this Project could be contracted. With this in mind, it is recommended that <br />both projects be designed and bid together, with the Park Street replacement as an option. If pricing is within budget, it <br />will be included in the contract. If not, the City will construct in-house, using the plans prepared by the Engineer. <br />The firm of Claunch and Miller, Inc. was selected to submit a proposal for professional engineering services for the <br />Project, due to similar experience with the design of waterline and sidewalk replacement on Farrington Blvd., Old <br />Orchard, and Catlett, as well as the first portion of Park Street. The Proposal is as follows (all fees are lump sum): <br />Engineering Services <br />Preliminary Engineering Phase $ 7,200.00 <br />Final Design Phase 21,550.00 <br />Construction Phase 5,000.00 <br />Special Services (subcontract) <br />Survey 7,700.00 <br />Geotechnical 1,320.00 <br />Total Engineering Services $42,770.00 <br />The Agreement also establishes fees for construction observation and additional services. These services will not be <br />provided unless requested by the City of La Porte. <br />Action Required by Council: Approve Ordinance No. 99- authorizing the City Manager to execute an agreement with <br />Claunch & Miller, Inc. to provide professional engineering services for waterline replacement in the amount of <br />$42,770.00. <br />Availability of Funds: <br />General Fund_ Water/Wastewater <br />76X Capital Improvement Other <br />Account Number: Utility CIP Fund (Fund 03) Funds Available: XX YES _ NO <br />Approved for City Council Agenda <br />I-o 11-09°qi <br />Robert T. Herrera Date <br />City Manager <br />