Laserfiche WebLink
AUNCH & MILLOER. INC. <br />Engineering Consultants <br />ATTACHMENT "A" <br />CITY <br />SEC.,-•dL 1i'11-i ij•� <br />October 25, 1999 OF fir` ` _..._ <br />Mr. Steve Gillett <br />Director of Public Works <br />P.O. Box 1115 <br />LaPorte, TX 77572-1115 <br />RE: Engineering Services for Waterline Improvements <br />on Catlett and Park Drive <br />Dear Mr. Gillett: <br />Claunch & Miller, Inc. (CMI) is pleased to submit this proposal for providing engineering services <br />on the above referenced project. <br />DESCRIPTION OF PROJECT <br />The project consists of waterline improvements in two (2) separate locations. <br />Catlett- This improvement includes the replacement of an existing 6" waterline with a new <br />8" waterline along Catlett Street from Farrington Blvd. to Valley Brook Drive <br />(approximately 2,150'). This project also includes the replacement of all of the existing <br />sidewalk on the north side of Catlett for this segment. <br />Park Drive- This improvement involves the replacement of an existing 6" waterline with an <br />8" waterline along park Drive from to Oak Grove to Bayridge (approximately 2000 L.F.). <br />The preliminary estimated construction cost for the improvements is $316,775.45. <br />Page 1 of 6 <br />3701 Kirby Drive, Suite 860 - Houston, Texas 77098 - (713) 524-7113 <br />