My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2000 01-17 Special Called Workshop Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
2000's
>
2000
>
2000 01-17 Special Called Workshop Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:13 PM
Creation date
3/21/2025 1:56:34 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
1/17/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />December 13, 1999 <br />Mr. Robert Herrera, City Manager <br />City of La Porte <br />604 W. Fairmont Pazkway <br />La Porte, TX 77571 <br />Deaz Bob: <br /> <br />City of Frien <br />~~ <br />~. <br />DEC ~f;. <br />171999 fr` <br />.,; <br />ja <br />~~ <br />I~ i ~ ~ L'i is ~ 1` _^ i <br />~~~- ----,;; ~l <br />SAN®® i <br />___ <br />~- uU ~'r <br />Can N~..i A ~-r: J <br />• OFrtCr _ <br />. J"L <br />c~CT <br />Friendswood is interested in purchasing any additional water that may be available from your <br />city or entity. <br />Our interest is for two reasons. First, the city is growing at a considerable rate, and our needs for <br />the build out of our community aze greater that the existing supply of surface water. Currently, <br />Friendswood has a capacity in the Southeast Water Purification Plant (SEWPP) of 3 MGD. We <br />estimate the city will require 10 MGD of surface water for build out. It will be in the city's long- <br />term best interest to acquire as much capacity now as possible to meet the demands of growth. <br />Second, the Harris-Galveston Coastal Subsidence District has amended their Regulatory Plan. <br />Friendswood is in Area 2 of and will be required to utilize surface water on a ratio of 80:20 <br />surface water to ground water beginning January 1, 2001, unless a certified Groundwater <br />Reduction Plan (GRP) is in place. One of the conditions of a certified GRP is that the city have <br />surface water capacity in place to meet those requirements. <br />It is imperative we have sufficient surface water capacities to meet the demands of growth and <br />the requirements of the Subsidence District. Our request to purchase surface water capacity from <br />you is critical. Please let us know if you have water to sell, the amount, and the cost as soon as <br />possible. We will be happy to meet with you at your convenience to further discuss the matter. <br />9i0 South Friendswood Drive •Friendswood, Texas 77546-4856 (7i3) 996-3200 Fax (7i3) 482-3722 <br />
The URL can be used to link to this page
Your browser does not support the video tag.