My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2000-06-26 Regular Meeting and Special Called Workshop Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
2000's
>
2000
>
2000-06-26 Regular Meeting and Special Called Workshop Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:13 PM
Creation date
3/21/2025 1:57:28 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
6/26/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />as more particularly described by metes and bounds on Exhibit IIAII, <br />both attached hereto and made a part hereof. In addition, Grantee <br />shall have the right to use such addi tional space as may be <br />necessary for the construction, maintenance and repair of the <br />Pipeline along the route of same. Grantee agrees, at the time of <br />construction, to bury said Pipeline (except for fittings, corrosion <br />control equipment, marker signs, vent posts and other apparatus) to <br />a depth of at least forty-eight inches (48"). <br />Grantor further grants and conveys unto Grantee the right of <br />ingress and egress on, over, across and through said thirty foot <br />(30') strip of land for all purposes necessary or incidental to the <br />exercise of the rights herein granted. <br />Grantor reserves the right to use and enjoy said lands except <br />as may be necessary for the purposes herein granted, provided <br />Grantor shall not construct or permit to be constructed any house, <br />structure, reservoir or other obstruction or excavation on, over or <br />within said permanent right of way and easement and will not change <br />the grade over any Pipeline constructed hereunder; however, Grantor <br />specifically reserves the right for perpendicular crossings of <br />Grantee's Pipeline with pipelines, roads, streets, driveways, rail <br />spurs, water lines, sewer lines and other utilities or facilities, <br />and any other use of the property not inconsistent with Grantee's <br />non-exclusive rights under this Right of Way Grant. <br />The consideration recited above, shall constitute the full <br />consideration for the right of way and easement herein granted, and <br />for normal construction damages. Grantee further agrees to pay for <br />all damages to growing crops, fences and timber on said land which <br />may be caused in the future by the exercise of the rights granted <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.