Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />REQUEST FOR CITY COUNCIL AGENDA ITEM <br /> <br />Agenda Date Requested: August 14, <br /> <br />Requested By: Doug Kneuppe <br /> <br />Report <br /> <br />Exhibits: Ordinance <br />Letter of Recommendation <br />Bid Tabulation <br />Bidder List <br /> <br /> <br />jl... Department: <br />esolution <br /> <br />Planning <br />XX Ordinance <br /> <br />Summarv & Recommendation <br /> <br />The 99-00 CIP Budget includes $40,000 for roof replacement at the Police Department building <br />and $23,000 for roof replacement at the EMS building for a total budget amount of$63,000. The <br />PD building includes approximately 13,500 square feet of roof removal and replacement along <br />with the manipulation of nine rooftop alc units. The EMS building includes approximately 4,300 <br />square feet of roof removal and replacement. Unfortunately, the budget estimates were provided <br />by contractors without benefit of a thorough investigation. During the preliminary design phase, <br />the consultant estimated these projects could cost as much as $135,000::1:. <br /> <br />Analysis and design was perfonned utilizing DCW Architects and Bridges & Co. International. <br />On August 7, 2000, the City received competitive bids from six qualified contractors (see <br />attached Bid Tabulation). Pyramid Waterproofing, Inc., of Houston, Texas submitted the low <br />bid in the amount of $90,700. The contract bid time is 40 consecutive calendar days once the <br />''Notice to Proceed" is issued. <br /> <br />The consultants and staffhave reviewed the bids submitted and determined the low bid from <br />Pyramid Waterproofing, Inc. is acceptable and they are qualified to perforin the work. Staff <br />recommends that Council authorize the City Manager to execute a contract with Pyramid <br />Waterproofing, Inc. in the amount of $90,700 and further authorizing $4,535 (5%) contingency <br />for replacement of roofs at the PD and EMS buildings. <br /> <br />The additional funds necessary to award this bid are available in the General CIP Fund <br />Contingency Account. <br /> <br />Action Required bv Council: <br /> <br />Consider approval of an ordinance authorizing the City Manager to execute a contract with <br />Pyramid Waterproofing, Inc. in the amount of $90,700 and further authorizing $4,535 <br />contingency for the replacement of roofs at the PD and EMS buildings. <br /> <br />Availability of Funds: <br />General Fund <br />XX Capital Improvement <br />Account Number: 015-9892-803-1100 <br /> <br />W ater/W astewater <br />Other <br />Funds Available: XX Yes <br /> <br />No <br /> <br />Approved for City Council Agenda <br /> <br />Q~ To ~~ <br />Robert T. Herrera <br /> <br />. g..,O"OO <br />Date <br /> <br />.-i. '. ~ r..... <br />