My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2002-01-14 Regular Meeting
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
2000's
>
2002
>
2002-01-14 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 7:55:50 AM
Creation date
3/21/2025 2:00:31 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
1/14/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Agenda Date Requested: January 14 2002. <br />Requested By: S. Gillett ln&-s --- ! <br />Department: Public Works <br />Report: Resolution: Ordinance: XX <br />Exhibits: Ordinance <br />Exhibits: Engineer's Recommendation <br />Exhibits: <br />Appropriation <br />Source of Funds: Utility CIP <br />Account Number: 003-9890-864-1100 <br />Amount Budgeted: %75,000 <br />Amount Requested: $55,660 <br />Budgeted Item: YES <br />SUMMARY & RECOMMENDATION <br />Tank inspections performed by Dunham Engineering recommended recoating of the elevated water storage tank in <br />the former Bayshore MUD. This tank was last coated in 1991. The paint system has performed well, and the <br />Engineer recommends recoating before the paint system begins to fail. <br />Dunham Engineering has designed the proposed improvements, and sealed bids were received on December 17, <br />2001 from four (4) contractors. Low bid was submitted by Gulf States Coatings, Inc. of La Porte in the amount of <br />$50,600. A total of 75,000 was budgeted for this Project. <br />As illustrated by the attached bid tabulation, the bids ranged from a high of $96,772 to the low bid. Low bidder was <br />checked by the Engineer for past work experience, safety experience and references. Gulf States Coatings, Inc. has <br />successfully completed projects for the Engineer, and is recommended by the Engineer for bid award. <br />A total of $69,000 is available in the Project budget for construction. It is recommended that the contract be <br />awarded to Gulf States Coatings, Inc. in the amount of $50,600. A contingency of $5,060 is also recommended. <br />Action Required by Council: Approve an ordinance authorizing the City Manager to execute a contract <br />with Gulf States Coatings, Inc. in the amount of $50,600, with a contingency of $5,060. <br />Approved for City Council Agenda <br />Robert T. Herrera, City Manager Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.