Laserfiche WebLink
HARRIS COUNTY, TEXAS <br />ENGINEERING COST ESTIMATE <br />LEFT TURN LANE CONSTRUCTIONS AT THE INTERSECTIONS OF FAIRMONT PARKWAY (22583-3-4) <br />AT BROOKWOOD DRIVE, WILMONT DRIVE, AND FARRINGTON BOULEVARD <br />IN HARRIS COUNTY, PRECINCT 2 <br />KLOTZ ASSOCIATES PROJECT NO. 11678 <br />BID TABULATION SHEET <br />ITEM <br />NO. <br />SPEC <br />ITEM NO. <br />QUAN. <br />UNIT <br />BID ITEM DESCRIPTION <br />AAA Asphalt Paving, Inc. <br />Pedko Pavirt ,'Inc. <br />Silva, Inc. <br />UNIT <br />PRICE <br />AMOUNT <br />BID <br />UNIT <br />PRICE <br />AMOUNT <br />BID <br />UNIT <br />PRICE. <br />AMOUNT <br />BID <br />E. SIGNING AND PAVEMENT MARKING ITEMS <br />16 <br />642 <br />646 <br />10 <br />EA <br />Furnish and install regulatory or warning traffic signs on <br />2.375" O.D. galvanized steel pole <br />$300.00 <br />$3,000.00 <br />$269.12 <br />•$2,691.20 <br />$270.00 <br />$2,700.00 <br />17 <br />500 <br />646 <br />4 <br />EA <br />Remove and relocate existing traffic signs <br />$150.00 <br />$600.00 <br />$125.00 <br />$500.00 <br />$125.00 <br />$500.00 <br />18 <br />660 <br />3,200 <br />LF <br />Type II striping, reflectorized white 4" width <br />$0.25 <br />$800.00 <br />$0.20 <br />$640.00 <br />$0.20 <br />$640.00 <br />19 <br />660 <br />1 1,050 <br />LF . <br />T pe If striping, reflectorized white 8" width <br />$0.45 <br />$472.50 <br />$0.36 <br />$378.00 <br />$0.36 <br />$378.00 <br />20 <br />660 <br />205 <br />LF <br />Type 11 striping, reflectorized white 24" width <br />$2.50 <br />$512.50 <br />$2.00 <br />$410.00 <br />$2.00 <br />$410.00 <br />21 <br />660 <br />2,940 <br />LF • <br />Type 11 stri ing, reflectorized yellow 4" width <br />$0.25 <br />$135.00 <br />$0.20 <br />$588.00 <br />$0.20 <br />$588.00 <br />22 <br />660 <br />100 <br />LF <br />Type li striping, reflectorized yellow 24" width <br />$2.50 <br />$250.00 <br />$2.00 <br />$200.00 <br />$2.00 <br />$200.00 <br />23 <br />663 <br />202 <br />EA <br />Furnish and install reflectorized pavement markers, Type I-C <br />$4.50 <br />$909.00 <br />$4.00 <br />$808.00 <br />$4.00 <br />$808.00 <br />24 <br />663 <br />80 <br />EA <br />Furnish and install reflectorized pavement markers, ape 11 A -A <br />$4.50 <br />$360.00 <br />$4.00 <br />$320.00 <br />$4.00 <br />$320.00 <br />25 <br />663 <br />47 <br />EA <br />Furnish and install reflectorized pavement markers, Type II C-R <br />$4.50 <br />$211.50 <br />$4.00 <br />$188.00 <br />$4.00 <br />$188.00 <br />26 <br />663 <br />198 <br />EA <br />Furnish and install traffic buttons, 4" round ceramic, white <br />non-reflectorized <br />$4.50 <br />$891.00 <br />$4.00 <br />$792.00 <br />$4.00 <br />$792.00 <br />27 <br />663 <br />34 <br />EA <br />Furnish and install traffic buttons, 4" round ceramic, yellow <br />non-reflectorized <br />$4.50 <br />$153.00 <br />$4.00 <br />$136.00 <br />$4.00 <br />$136.00 <br />SUBTOTAL E. SIGNING AND PAVEMENT MARKING ITEMS <br />$8,894.50 <br />$7,651.20 <br />$7,660.00 <br />F. TRAFFIC SIGNAL ITEMS <br />28 <br />1000 <br />1 <br />LS <br />Traffic Signal Modification at Fairmont Pkwy and Farrington Dr <br />(excluding items listed below) <br />$8,500.00 <br />$8,500.00 <br />$5,300.00 <br />$5,300.00 <br />$5,300.00 <br />$5,300.00 <br />29 <br />690 <br />693 <br />1 <br />EA <br />Furnish and install one-way, 4-section, 12" horizontal span wire <br />mount signal head (R,R,<A,<G) with glass lenses, downlight and <br />"Left Turn Signal" sign <br />$1,200.00 <br />$1,200.00 <br />$850.00 <br />$850.00 <br />$850.00 <br />$850.00 <br />30 <br />1000 <br />220 <br />LF <br />Sawcut and install loop detectors <br />$12.00 <br />$2,640.00 <br />$9.00 <br />$1,980.00 <br />$9.00 <br />$1,980.00 <br />SUBTOTAL F. TRAFFIC SIGNAL ITEMS <br />$12,340.00 <br />$8,130.00 <br />$9,130.00 <br />A. SITE PREPARATION AND EARTHWORK ITEMS <br />B. PAVEMENT ITEMS <br />C. TRAFFIC CONTROL ITEMS <br />D. STORM WATER POLLUTION PREVENTION ITEMS <br />E. SIGNING AND PAVEMENT MARKING ITEMS <br />F. TRAFFIC SIGNAL ITEMS <br />$45,268.00 <br />$144,539.10 <br />$43,625.00 <br />$6,600.00 <br />$8,894.50 <br />$12,340.00 <br />-$34,166.00 <br />$153,571.80 <br />$22,642.50 <br />$3,690.00 <br />::. $7,651.20 <br />$8,130.00 <br />$40,759.00 <br />$132,159.24 <br />$61,046.40 <br />$6,582.00 <br />$7,660.00 <br />$8,130.00 <br />TOTAL BID AMOUNT (A + B + C + D + E + F) <br />$261,266.60 <br />., . $229,851.50 <br />$256,336.64 <br />0 <br />11/26/2003 Page 2 bid tabulation FAIRMONT <br />