HARRIS COUNTY, TEXAS
<br />ENGINEERING COST ESTIMATE
<br />LEFT TURN LANE CONSTRUCTIONS AT THE INTERSECTIONS OF FAIRMONT PARKWAY (22583-3-4)
<br />AT BROOKWOOD DRIVE, WILMONT DRIVE, AND FARRINGTON BOULEVARD
<br />IN HARRIS COUNTY, PRECINCT 2
<br />KLOTZ ASSOCIATES PROJECT NO. 11678
<br />BID TABULATION SHEET
<br />ITEM
<br />NO.
<br />SPEC
<br />ITEM NO.
<br />QUAN.
<br />UNIT
<br />BID ITEM DESCRIPTION
<br />AAA Asphalt Paving, Inc.
<br />Pedko Pavirt ,'Inc.
<br />Silva, Inc.
<br />UNIT
<br />PRICE
<br />AMOUNT
<br />BID
<br />UNIT
<br />PRICE
<br />AMOUNT
<br />BID
<br />UNIT
<br />PRICE.
<br />AMOUNT
<br />BID
<br />E. SIGNING AND PAVEMENT MARKING ITEMS
<br />16
<br />642
<br />646
<br />10
<br />EA
<br />Furnish and install regulatory or warning traffic signs on
<br />2.375" O.D. galvanized steel pole
<br />$300.00
<br />$3,000.00
<br />$269.12
<br />•$2,691.20
<br />$270.00
<br />$2,700.00
<br />17
<br />500
<br />646
<br />4
<br />EA
<br />Remove and relocate existing traffic signs
<br />$150.00
<br />$600.00
<br />$125.00
<br />$500.00
<br />$125.00
<br />$500.00
<br />18
<br />660
<br />3,200
<br />LF
<br />Type II striping, reflectorized white 4" width
<br />$0.25
<br />$800.00
<br />$0.20
<br />$640.00
<br />$0.20
<br />$640.00
<br />19
<br />660
<br />1 1,050
<br />LF .
<br />T pe If striping, reflectorized white 8" width
<br />$0.45
<br />$472.50
<br />$0.36
<br />$378.00
<br />$0.36
<br />$378.00
<br />20
<br />660
<br />205
<br />LF
<br />Type 11 striping, reflectorized white 24" width
<br />$2.50
<br />$512.50
<br />$2.00
<br />$410.00
<br />$2.00
<br />$410.00
<br />21
<br />660
<br />2,940
<br />LF •
<br />Type 11 stri ing, reflectorized yellow 4" width
<br />$0.25
<br />$135.00
<br />$0.20
<br />$588.00
<br />$0.20
<br />$588.00
<br />22
<br />660
<br />100
<br />LF
<br />Type li striping, reflectorized yellow 24" width
<br />$2.50
<br />$250.00
<br />$2.00
<br />$200.00
<br />$2.00
<br />$200.00
<br />23
<br />663
<br />202
<br />EA
<br />Furnish and install reflectorized pavement markers, Type I-C
<br />$4.50
<br />$909.00
<br />$4.00
<br />$808.00
<br />$4.00
<br />$808.00
<br />24
<br />663
<br />80
<br />EA
<br />Furnish and install reflectorized pavement markers, ape 11 A -A
<br />$4.50
<br />$360.00
<br />$4.00
<br />$320.00
<br />$4.00
<br />$320.00
<br />25
<br />663
<br />47
<br />EA
<br />Furnish and install reflectorized pavement markers, Type II C-R
<br />$4.50
<br />$211.50
<br />$4.00
<br />$188.00
<br />$4.00
<br />$188.00
<br />26
<br />663
<br />198
<br />EA
<br />Furnish and install traffic buttons, 4" round ceramic, white
<br />non-reflectorized
<br />$4.50
<br />$891.00
<br />$4.00
<br />$792.00
<br />$4.00
<br />$792.00
<br />27
<br />663
<br />34
<br />EA
<br />Furnish and install traffic buttons, 4" round ceramic, yellow
<br />non-reflectorized
<br />$4.50
<br />$153.00
<br />$4.00
<br />$136.00
<br />$4.00
<br />$136.00
<br />SUBTOTAL E. SIGNING AND PAVEMENT MARKING ITEMS
<br />$8,894.50
<br />$7,651.20
<br />$7,660.00
<br />F. TRAFFIC SIGNAL ITEMS
<br />28
<br />1000
<br />1
<br />LS
<br />Traffic Signal Modification at Fairmont Pkwy and Farrington Dr
<br />(excluding items listed below)
<br />$8,500.00
<br />$8,500.00
<br />$5,300.00
<br />$5,300.00
<br />$5,300.00
<br />$5,300.00
<br />29
<br />690
<br />693
<br />1
<br />EA
<br />Furnish and install one-way, 4-section, 12" horizontal span wire
<br />mount signal head (R,R,<A,<G) with glass lenses, downlight and
<br />"Left Turn Signal" sign
<br />$1,200.00
<br />$1,200.00
<br />$850.00
<br />$850.00
<br />$850.00
<br />$850.00
<br />30
<br />1000
<br />220
<br />LF
<br />Sawcut and install loop detectors
<br />$12.00
<br />$2,640.00
<br />$9.00
<br />$1,980.00
<br />$9.00
<br />$1,980.00
<br />SUBTOTAL F. TRAFFIC SIGNAL ITEMS
<br />$12,340.00
<br />$8,130.00
<br />$9,130.00
<br />A. SITE PREPARATION AND EARTHWORK ITEMS
<br />B. PAVEMENT ITEMS
<br />C. TRAFFIC CONTROL ITEMS
<br />D. STORM WATER POLLUTION PREVENTION ITEMS
<br />E. SIGNING AND PAVEMENT MARKING ITEMS
<br />F. TRAFFIC SIGNAL ITEMS
<br />$45,268.00
<br />$144,539.10
<br />$43,625.00
<br />$6,600.00
<br />$8,894.50
<br />$12,340.00
<br />-$34,166.00
<br />$153,571.80
<br />$22,642.50
<br />$3,690.00
<br />::. $7,651.20
<br />$8,130.00
<br />$40,759.00
<br />$132,159.24
<br />$61,046.40
<br />$6,582.00
<br />$7,660.00
<br />$8,130.00
<br />TOTAL BID AMOUNT (A + B + C + D + E + F)
<br />$261,266.60
<br />., . $229,851.50
<br />$256,336.64
<br />0
<br />11/26/2003 Page 2 bid tabulation FAIRMONT
<br />
|