Laserfiche WebLink
<br />eM! Job No. 03-093 <br /> <br />City of La Porte <br />Public Work's Metal Building <br /> <br />the type of work involved, the length of duration thereof, the elements of the bid, <br />history and performance of bidders in previous jobs and other factors as shall be <br />determined by the Owner. The Owner reserves the right to reject any or all bids and <br />to waive bid irregularities as the interest of the Owner may require. <br /> <br />(b) Performance and Payment Bonds - The bidder must be capable of executing <br />satisfactory performance bond and payment bond for 100 percent of the contract sum <br />in accordance with the conditions of the contract. <br /> <br />(c) Preconstruction Conference - A preconstruction conference will be held with the <br />successful bidder prior to construction at a time and place designated by the <br />Engineer. The contractor shall provide his anticipated construction schedules either <br />prior or at the time of the preconstruction conference. <br /> <br />(d) Affidavits of Bills Paid - The City of La Porte reserves the right, prior to final <br />acceptance of this project, to require the Contractor to execute an affidavit certifying <br />that all bills for labor, materials and incidentals incurred in the construction of the <br />improvements contemplated by the contract documents have been paid in full and <br />that there are no claims pending of which the Contractor has been notified. <br /> <br />IB-6 <br />