My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2004-03-22 Regular Meeting, Public Hearing and Workshop Meeting Minutes
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
2000's
>
2004
>
2004-03-22 Regular Meeting, Public Hearing and Workshop Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:19 PM
Creation date
3/21/2025 2:03:59 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
3/22/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />eM! Job No. 03-093 <br /> <br />City of La Porte <br />Public Work's Metal Building <br /> <br />the type of work involved, the length of duration thereof, the elements of the bid, <br />history and performance of bidders in previous jobs and other factors as shall be <br />determined by the Owner. The Owner reserves the right to reject any or all bids and <br />to waive bid irregularities as the interest of the Owner may require. <br /> <br />(b) Performance and Payment Bonds - The bidder must be capable of executing <br />satisfactory performance bond and payment bond for 100 percent of the contract sum <br />in accordance with the conditions of the contract. <br /> <br />(c) Preconstruction Conference - A preconstruction conference will be held with the <br />successful bidder prior to construction at a time and place designated by the <br />Engineer. The contractor shall provide his anticipated construction schedules either <br />prior or at the time of the preconstruction conference. <br /> <br />(d) Affidavits of Bills Paid - The City of La Porte reserves the right, prior to final <br />acceptance of this project, to require the Contractor to execute an affidavit certifying <br />that all bills for labor, materials and incidentals incurred in the construction of the <br />improvements contemplated by the contract documents have been paid in full and <br />that there are no claims pending of which the Contractor has been notified. <br /> <br />IB-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.