Laserfiche WebLink
<br /> <br />March 22, 2004 <br /> <br />City of La Porte <br />604 W. Fairmont Pkwy <br />La Porte, TX 77571 <br /> <br />RE: Metal Building <br />Public Works Department <br /> <br />Please note, our proposal is based on using a building provided by Whirlwind <br />Manufacturing. This building is to be fabricated according to standard prefabricated <br />metal building specifications. The roof and wall sheets are to be Whirlwind's standard <br />colors and shapes. <br />. Roof, 26 gauge galvalume <br />. Walls, 26 gauge, Monarch Profile, Siliconized Polyster Paint, 30 Year limited <br />Color Warranty <br /> <br />According to Whirlwind, the delivery date is 14 weeks from date of order, due to the <br />problems of steel delivery to them. This time could shorten if steel availability improves. <br /> <br />Based on this information, total project time is 16 weeks. This includes the 14 weeks for <br />delivery of building and 2 weeks for erection of building. This timeframe is still <br />contingent on Whirlwind's delivery date and may change due to steel availability. <br /> <br />Sincerely, <br /> <br />Lacy Moore <br />President <br /> <br />530 S. BROADWAY. LA PORTE, TX . 77571 <br />PHONE: 281-604-0536 . FAX: 281-604-0537 <br />WWW.LMCONTRACTORS.COM <br />