Laserfiche WebLink
<br /> DESIGN COMMITTEE <br /> POTENTIAL STRATEGIC PLAN & WORK PLAN <br /> 2004 - 2005 <br /> The Downtown Revitalization Board & Committees will determine what they will undertake and prioritize projects. <br />This is a partial list of issues pertinent to downtown and is in no particular order. The purpose is to get thoughts flowing, not dictate what will be done. <br />Now 1 Year 5 Year Project Overseen Bv: <br /> a. Billboards <br /> I. Select locations <br /> 2. Raise funds <br /> 3. Graphics <br /> b. Gateway Entries <br /> I. Select locations <br /> 2. Determine appropriate design elements <br /> 3. Schematic drawings and cost <br /> 4. Raise funds <br /> 5. Work with TXDOT, etc. <br /> c. Main Street logo <br /> 1. Have graphic artist work up samples <br /> d. Main Street Committee <br /> I. Work with moratorium group on architectural & preservation measures for the new Main Street ordinances <br /> e. Connect with Sylvan Beach <br /> I. Wayfmding Signage <br /> 2. Landscaping <br /> 3. Streetscaping <br /> 4. Gateway entries <br /> PRELIMINARY PLAN 10/04 <br /> Design - 1 <br /> <br />-, <br /> <br />_I <br /> <br />