My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2006-09-25 Regular Meeting and Workshop Meeting of La Porte City Council Minutes
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
2000's
>
2006
>
2006-09-25 Regular Meeting and Workshop Meeting of La Porte City Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:21 PM
Creation date
3/21/2025 2:09:05 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
9/25/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of LllPorlc . rOlld <br />2l S~pl<ltllbcr2006 <br />Page Two <br /> <br />The scope dO$S not include the following services; however, jf required Effective <br />Environmental, Inc. will provide them under a separate Scope of Work. Services not <br />included in this scope of work include but are not limited to the following: <br />1. Groundwater sampling and analysis <br />2. Pumping of the pond to prepare and maintain the work area <br />3. Solidification of the material in any way <br />4. Removal, transportation and disposal of hazardous wastes <br />6. Additional site-work of any kind <br /> <br />If the above services become necessary during the course of this scope, the client will <br />be notified at the point in which Effective Environmental, Inc. is required to complete <br />such services. However, based on the information obtained to date, we feel that the <br />proposed scope is sufficient to successfully. remediate the area. <br /> <br />TERMS AND COMPENSATION <br /> <br />The volume estimates used to derive the base price were provided by the City. <br />They are as follows: <br /> <br />· Excavate contaminated sedUnent and soil; est.220 cy in place <br />· Load, tra.nsport and dispose of Class II soil; est. 300 cy removed <br />· Sample for Ph to determine disposal options and stopping point <br />· Purchase, transport and place clean, select fill; 0 cy <br />. Mob! demob, vis queen, misc. materials, etc. for yardage above <br />. Prepare waste profiles, manife~ts, labels, transport! disposal <br />. Document the activities <br /> <br />We have been assured by City personnel that the pond will be dry and suitable. for placement ofa <br />wide-track dozer. Our plan and prlc.ing is predicated upon the fact that upon arrival we can place <br />the dozer in the pond to push the material into the SW comer. An ~caYa:tor will then be utilized <br />to remove the sediment from the pond and place it directly into transport trucks. The same <br />procedure will be followed for the ditch cleaning process. <br /> <br />If conditions at the site do not confonn to the plan above, we may be forced to employ a long- <br />stick excavator, pumping, drying and mixing activities to prop~rly complete the work. As <br />always, the City will have the option to utilize its own equipment and labor resources to assist. <br /> <br />... Continued <br /> <br />3 <br /> <br />S/v:d <br /> <br />S00S0Lvl82:m <br /> <br />:NO~~ 2S:SJ 9002-22-d3S <br />
The URL can be used to link to this page
Your browser does not support the video tag.