My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2009-01-12 Regular Meeting, Public Hearings and Workshop Meeting of the La Porte City Council (2)
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
2000's
>
2009
>
2009-01-12 Regular Meeting, Public Hearings and Workshop Meeting of the La Porte City Council (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:24 PM
Creation date
3/21/2025 2:14:35 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
1/12/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />LJA Engineering & Surveying, Inc. <br /> <br />IA <br /> <br />11821 East Freeway <br />Suite 400 <br />Houston. Texas 77029 <br /> <br />Phone 713.450.1300 <br />Fax 713.450.1385 <br />www.ljaengineering.com <br /> <br />CHANGE ORDER NO.1 <br /> <br />December 3, 2008 <br /> <br />Honorable Mayor and City Council <br />City of La Porte <br />604 W. Fairmont Parkway <br />La Poret, TX 77571 <br /> <br />SUBJECT: Request for Change in Contract Amount <br />CONTRACTOR: Mar-Con Services, Inc. <br />CONTRACT DATED: October 13,2008 <br />ORIGINAL CONTRACT AMOUNT: $289,832.50 <br />LJA PROJECT NO. EI70-0050-4 <br /> <br />Honorable Mayor and Council, <br /> <br />In accordance with Article 10 of the General Conditions of the Agreement, the Owner has <br />requested a change in the Contract Amount for the following additional work: <br /> <br />1,488 L.F. 8-Inch Waterline PVC AWWA C-900 Pipe @$28.75 P/L.F. <br />3 Each 8-Inch Gate Valves w/Box @ $1,179.10 PlEA. <br />5 Each - Remove & Salvage Fire Hydrants @ $185.00 PlEA. <br />5 Each - Fire Hydrant Assembly @ $2,914.50 PlEA. <br />3 Each - 8-Inch Wet Connections @ $722.10 PlEA. <br />2 Each - 8-Inch Long Service Replacement @ $3,608.90 <br />1 Each - 2-Inch Service Reconnect @ $1,150.00 <br />TOTAL <br /> <br />$42,780.00 <br />$ 3,537.30 <br />$ 925.00 <br />$14,572.50 <br />$ 2,166.30 <br />$ 7,217.80 <br />$ 1.150.00 <br />$72,348.90 <br /> <br />Contractor has proposed to do the above additional work for the City of La Porte on the 16th <br />Street Waterline Replacement from West G Street to Fairmont Parkway. Contractor request an <br />additional 20 Working Days to perform the work (See attached sheet for a complete cost <br />breakdown for items listed above). Contractor proposes to do this work for a total cost of <br />$72,348.90. <br /> <br />LJA Engineering & Surveying, Inc. considers the cost reasonable and recommend approval of <br />this Change Order for an additional cost to the contract in the amount of $72,348.90. <br />
The URL can be used to link to this page
Your browser does not support the video tag.