My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2009-02-09 Regular Meeting, Public Hearing and Workshop Meeting of the La Porte City Council
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
2000's
>
2009
>
2009-02-09 Regular Meeting, Public Hearing and Workshop Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:24 PM
Creation date
3/21/2025 2:14:46 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
2/9/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MINIMUM STANDARD REQUIRED ITEMS TO BE FURNISHED AND INSTALLED <br />AS A PART OF THIS REQUEST FOR PROPOSAL: <br /> <br />1. One (1) pump housing and fountain stem, minimum. <br /> <br />2. One (1) stone foundation with upper pool, minimum. <br /> <br />3. Plant material of sufficient quantity and suitability that, when mature, the approximately 3,600 sq. <br />ft. on the north and west banks of the existing pond will be "no mow" zones. If the polishing stream <br />is incorporated into the proposal, the landscaping in that area should also be, when mature, a "no <br />mow" zone. <br /> <br />4. If the polishing stream option is exercised (see Conceptual Drawing), then an installed spray <br />apparatus such as an Otterbine sprayer, will be required for the pond itself for purposes of <br />aeration. <br /> <br />5. Electrical wiring and conduit, connections, meter, complete, to operate waterfall pump, fountain <br />aerator (if proposed) according to the City of La Porte electrical code and permitting. <br /> <br />6. Provision for cleanup of construction debris, concrete forms, etc. <br /> <br />7. Minimum sizes for plant materials for this contract: Groundcover - Wedelia (Wedelia texana) or <br />approved equal, 4" pot. Trees - Bald Cypress (Taxodium distichum) or approved equal, 2" <br />caliper, 15 gallon container. <br /> <br />8. Minimum quantity of trees to be provided for this project; 30 ea., with fill-in of groundcover <br />materials sufficient to meet requirement #3 above. <br /> <br />9. Maximum acceptable completion time for this project is one hundred twenty (90) days from Notice <br />to Proceed. <br /> <br />Page 21 of30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.