Laserfiche WebLink
<br />NEILL ASSOCIATES, ING. <br /> <br />June 12,2009 <br /> <br />To: PBS &J <br />1250 Wood Branch Road, 5te 300 <br />Houston, Texas, 77079 <br /> <br />Re: Laportc, Texas, New electrical service and transfer switch scheme <br />At: Nick Kaboudvand, P.E. <br /> <br />TIle following are my recommendations on the above project subject project. <br />1. This setup will allow the plant to combine the existing (2) two service into (1) one service. When a <br />power outage occurs the service can be transferred and powercd (generator) from one (1) location <br />with the proper load shedding from Plant personnel. <br />2. Wc have (2) two switchboard schemcs. A 3 section setup and a 4 section set up. \'(Te recommend the 3 <br />section line up. The 3 section will meet The NEC Code and will give adequate isolation to down <br />stream and the Utility loads. <br />See attached SKE-l (2 pages) <br /> <br />Should you have any further questions please feel free to call. <br />Sincerely, <br /> <br />.OtJU J. <br />rf"~ <br /> <br />Jack R Neill ,P.E. <br /> <br />President <br /> <br />21177 SOUTH GESSNER SUITE 227 . HOUSTON,TEXAS . 77063 <br />PHONE: (832)251-1783 . FAX; (832)251-1784 <br />