My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-17-07 Drainage and Flooding Committee Meeting
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
2007
>
09-17-07 Drainage and Flooding Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
3/21/2025 2:27:39 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
9/17/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5.10.2 Inlets <br /> <br />A. Curb inlets shall be spaced and sized to intercept the calculated runoff for the design <br />storm. The water surface elevation at the inlet shall be less than or equal to the top of <br />curb for the design storm flow. <br />B. Maximum travel distance of water in the street to a curb inlet shall be three hundred feet <br />(300') on a major thoroughfare and in a commercial area. The maximum travel distance <br />of water in the street permitted in a single-family residential area shall be four hundred <br />feet (400'). <br />C. No Valley Gutter without prior approval. <br />D. Curb inlets should be on the intersecting side street at intersections with a major <br />thoroughfare. The City Engineer shall specifically approve locations at intersections. <br />E. Grated inlets will not be permitted in an open ditch. <br />F. Backslope swale interceptors shall be placed in accordance with the requirements of <br />Harris County. <br />G. Curb inlets shall have solid inlet lids. Grate or Curb and Grate inlets shall not be allowed <br />for residential subdivisions. Curb inlets shall be recessed, unless otherwise directed by <br />the City Engineer. <br />H. Backfill around inlets and to top of first stage inlet with cement stabilized sand. <br /> <br />Storm water Criteria Page ] 0 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.