My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
02-18-08 Drainage and Flooding Committee Minutes
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
2008
>
02-18-08 Drainage and Flooding Committee Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
3/21/2025 2:27:51 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
2/18/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />10836 Spruce Dr. South <br />La Porte, TX 77571 <br />July ~, <br /> <br />Dear Mr. J oems: <br /> <br />/) o-le fl; ~ cia--Ie <br />0' f' f I; e jJ ef,l-/ol'} <br />Clnd 1h<,:-d ~c: 0/1 '-f4e <br />i. f> <br />etre:r -I-rO/J;h i-/; r!!? C,of- y~ <br />~~ <br /> <br />John Joems <br />City Manager <br />City of La Porte <br />604 W. Fairmont Parkway <br />La Porte, TX 77571 <br /> <br />We have a severe flooding problem in F airmont East subdivision. Twice in <br />the last 7 months we have had flood waters enter garages, and we have lost at least <br />5 cars to flooding that were parked on our street during rains. The flooding has <br />only worsened as out subdivision and adjoining subdivisions filled in with homes. <br />It is not a matter of if but only when flood waters will enter our homes. We <br />cannot tolerate the continuing flooding, and we appeal to your assistance in <br />eliminating this problem. <br /> <br />On numerous occasions City Public Works has inspected our storm sewers <br />and found no blockages. City Engineer Rodney Slayton inspected our street on <br />July 11, 2007, and stated that the flooding problems are probably caused by poor <br />structural design that should never have been approved by the City of La Porte. <br /> <br />We request that a surveying crew investigate the causes of our flooding. <br />Also, we expect a definite action plan from the City of La Porte to redress our <br />flooding problem. Finally, we ask that the city action plan be implemented in a <br />timely fashion. <br /> <br />We anxiously await your reply. Thank you. <br /> <br />Sincerely, <br />
The URL can be used to link to this page
Your browser does not support the video tag.