Laserfiche WebLink
<br />Drainage and Flooding Committee Meeting <br /> <br />Page 3 <br /> <br />Catlett Lane Pavement Replacement, Creekmont Park Overflow Path, Drainage Improvements <br />along Driftwood, Fleetwood Drive Outfall Pipe Upsizing, and Glen Meadows Subdivision <br />Interceptor Inlets. <br /> <br />Mr. Gillett reported property owners in the Creekmont Subdivision have not been contacted to gain <br />access to property. <br /> <br />City Manager Ron Bottoms reported the developer of the hotel on Fairmont Parkway was out of the <br />county and discussion to install pumps on the detention pond on Driftwood is pending. Mr. Bottoms <br />will report back to the committee at the next meeting. <br /> <br />Mr. Bottoms also reported he visited with City Manager Ron Crabtree regarding the development of <br />the subdivision near Wal-mart. Mr. Crabtree informed him the project was approved by Harris <br />County Flood Control District and water will drain to the detention pond on the North. <br /> <br />John Randolph with Harris County Flood Control District reported the county will proceed with <br />pipeline work on the F1016 Project. <br /> <br />Mr. Randolph reported he has not received a response from the Director for the Little Cedar Bayou <br />Project. <br /> <br />John Saavedra with Harris County Precinct Two reported on bidding for improvements on Spencer <br />Highway and Valley Brook. <br /> <br />Mr. Saavedra informed the committee he would make sure Harris County Flood Control District <br />reports back at the next meeting on the Little Cedar Bayou Project. <br /> <br />7. Administrative Reports. <br /> <br />A. Receive reports from City Staff, Harris County Flood Control District and Harris County <br />Precinct Two on drainage and flooding <br /> <br />Reports received above during item 6 from City Staff, Harris County Flood Control District and <br />Harris County Precinct Two on drainage and flooding <br /> <br />B. Receive report on changes to Flood Plain Maps in the City of La Porte. <br /> <br />Assistant City Manager John Joerns provided a report on Flood Plain Maps that are available <br />on the city's website. <br /> <br />Set date for next meeting <br /> <br />The Drainage and Flooding Committee set the next meeting date for May 12, 2008 at 5:00 <br />p.m. in the Council Chambers. <br />