Laserfiche WebLink
<br /> In-House Drainaae Proiects <br /> FY 2008/2009 <br />Cost Analysis <br />Bois '0' Arc I Santa Anna <br />Material: 36 LF 24" RCP $ 1,116.00 <br /> GS/lOO 31. 46 tons $ 361.79 <br /> White Rock 2 tons $ 24.00 <br /> Limestone 6 tons $ 121.38 <br /> Material Total: $ 1,623.17 $ 1,623.17 <br />Equipment: Gradall 8hrs $ 328.00 <br /> Dump Truck 8hrs $ 368.00 <br /> Dump Truck 8 hrs $ 368.00 <br /> 1 Ton Truck 4hrs $ 108.00 <br /> Trailer 4hrs $ 40.00 <br /> Equipment Total: $ 1,212.00 $ 1,212.00 <br />Labor: Senior Operator 8hrs $ 109.68 <br /> Operator I 8hrs $ 90.14 <br /> Operator I 8hrs $ 90.08 <br /> Operator I 8hrs $ 109.08 <br /> Operator I 8hrs $ 90.08 <br /> Labor Total: $ 489.06 $ 489.06 <br />Project Total ------------------------------------------------------------------------------- $ 3,324.23 <br /> <br />Mission @ North "P" <br />Material: 5 Sack Concrete 2.5 CY $ 317.90 <br /> #4 Rebar 200 LF $ 36.00 <br /> Material Total: $ 353.90 $ 353.90 <br />Equipment: 1/2 Ton PU 5 hrs $ 91. 00 <br /> 1 Ton Truck 5 hrs $ 135.00 <br /> Dump Truck 1 hr $ 56.00 <br /> Equipment Total: $ 282.00 $ 282.00 <br />Labor: Senior Operator 5 hrs $ 96.18 <br /> Operator I 12 hrs $ 204.38 <br /> Operator I 12 hrs $ 168.90 <br /> Operator I 5 hrs $ 63.55 <br /> Operator I 5 hrs $ 68.55 <br /> Labor Total: $ 601.56 $ 601.56 <br />Project Total ------------------------------------------------------------------------------- $ 1,237.46 <br />